We’re (hopefully) in the final stretch! We’re also in a sort-of liminal space in that we have a ton of projects going on simultaneously so it’s been hard to gauge where we are on the timeline because it feels like everything is happening, yet almost nothing is technically “finished.”
The biggest project we’ve made tremendous progress on is the flooring. And right behind that is the tilework. Both of which look absolutely fantastic.

This will easily feel like the longest one to two months of my life because 1) my excitement has reached critical mass, and 2) the trailer is hot and damp this time of year. We have three floor AC units and five dehumidifiers running almost nonstop and it still feels muggy inside. All. The. Time.



